Project Overview

  • Stage

    Completed

  • Year complete / due

    2023

  • Value

    $

    42680000

Harnest designed and delivered 110 apartments across four buildings in Reservoir for Homes Victoria under the RAP 1000 Homes initiative, bringing higher-density affordable housing into a traditionally low-rise suburb – the first project of its kind in the area.

Nisbett & Clingin, Reservoir

The Outcome

We delivered 110 apartments across four Class 2 apartment buildings under the RAP 1000 Homes initiative, introducing higher-density affordable housing into a traditionally low-rise suburb.

Key features include:

  • Lift access to the apartment buildings, providing accessible access for residents
  • Liveable Housing Guidelines (Silver Level) compliance, including level entry

Community benefit: provides 110 new affordable homes in Reservoir, strengthening community and stakeholder alignment around higher-density affordable housing in the area.

No items found.

The Method

Harnest led the project under a design and construct model for Homes Victoria, appointing a full consultant team and holding weekly design meetings to manage the complexity of a high-density, first-of-its-kind project for the area.

  • Pivoting the product type: the sites were originally allocated for townhouses, until a planning amendment required them to be delivered as apartments. We pivoted early to the new product type, keeping abortive work to a minimum.
  • Value engineering under design intent: adoption of AFS wall systems (precast concrete formwork) and window optimisation reduced cost and accelerated construction without compromising design intent.
  • Community-sensitive delivery: we worked closely with council to progress the project efficiently. Introducing higher-density housing into a traditionally low-rise suburb also required a dedicated community liaison, adherence to council working hours, safety and traffic planning, and ongoing street maintenance to minimise disruption and support resident engagement.
  • Program discipline: a critical path program of sequenced key activities kept milestones on track, with regular reviews alongside the client and superintendent, and the project delivered ahead of program.
No items found.

The Impact

This project demonstrates a repeatable model for delivering higher-density affordable housing, balancing program discipline, cost control and community outcomes.

Harnest designed and built the project under budget and ahead of program, despite the added complexity of introducing the area's first higher-density affordable housing development. At handover, all systems were tested and certified, residents were provided with tailored user manuals, and proactive inspections supported a smooth transition, with defects addressed responsively throughout the defects liability period.